Mapping

04/08/2023 – The path team will do some emergency repairs on this section next week to try to slow the water down and block some of the braids. This lower section will need to be built with pitching stone given the angle of the path which will require material to be flown in.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *